§ 105-210. Tree conservation standards.  


Latest version.
  • Prior to any tree removal or commencement of construction on a lot and continuing until a final plat has been recorded, or a certificate of occupancy has been issued, the following system shall be used:

    (1)

    Location and types of tree protection devices.

    a.

    Tree protection devices are to be installed as shown on the plan or otherwise completely surrounding the critical root zone.

    b.

    Active protection (see subsection (2) of this section) is required where tree save areas are located in proximity to construction activity.

    c.

    The locations of all tree protection devices will be verified prior to the issuance of the construction permit for clearing and/or grading.

    d.

    The critical root zone of specimen trees will be protected with a minimum four-foot tall chainlink or rail fence.

    (2)

    Materials. Active tree protection shall consist of chainlink, orange laminated plastic, wooden post and rail fencing or other equivalent restraining material placed at the edge of the critical root zone.

    (3)

    Sequence of installation and removal. All tree protection devices shall be installed prior to any clearing, grubbing or grading. The administrator must inspect the installation of tree protection and erosion and sedimentation control devices prior to land disturbance. Tree protection must remain in functioning condition until the certificate of occupancy is issued.

( Ord. No. 323-16, § 1, 4-25-2016 )